4. How long is the lead time?
March 12, 2019
Normally, if the stock products, the lead time will be 3 days. If the products need to be manufactured, the lead time will be 2 weeks after receiving your order.
Normally, if the stock products, the lead time will be 3 days. If the products need to be manufactured, the lead time will be 2 weeks after receiving your order.